1. Installation Requirements
โข Before installing the furnace, ensure the following conditions are met:
โข Place the furnace in a dry, dust-free environment.
โข Do not allow inflammable or combustible gases and liquids in the installation area.
โข Keep all combustible materials away from the furnace.
โข Maintain a minimum clearance of 50 mm around the furnace to allow proper ventilation and cooling.
2. Safety Precautions
โข To ensure safe operation:
โข Ensure the supporting surface is strong enough to bear the weight of the furnace.
โข When moving the furnace:
โข Maximum safe load per person: 30 kg
โข At least two people must lift or move the furnace to prevent strain or back injury.
โข Ensure air vents remain unobstructed at all times to prevent overheating.
3. Electrical Connection
โข Follow these electrical requirements before operating the furnace:
โข The sintering oven must be connected to a dedicated electrical circuit.
โข The buildingโs electrical circuit must include a suitable circuit breaker.
โข Install an additional residual-current circuit breaker (RCCB) with a 30 mA tripping current.
โข Ensure the protective earth conductor is properly connected to the power socket.
โข The furnace is supplied with a 2.0 m mains cable:
โข Do not use extension cables.
โข Confirm that the power supply voltage is between 200 โ 240 V before connecting.
4. Switching On the Furnace
โข To start the furnace:
โข Connect the furnace to the power supply.
โข Turn on the main power switch.
โข Check that the mains indicator lamp illuminates.
โข After approximately 3 seconds, the current furnace temperature will appear on the display.
5. Initial Commissioning
โข Follow these steps before running the first sintering cycle:
โข Press the door opener button to open the furnace door.
โข The electronic lock allows opening only when the temperature is below 300ยฐC.
โข Place the supporting stone inside the furnace.
โข Fill the standard sintering dish with the zirconia items to be sintered.
โข Using tongs, place the sintering dish onto the support pins inside the furnace.
โข Close the furnace door securely.
โข Start the firing cycle by pressing the Start/Stop button.
6. Programming the Heating Phases
โข To configure a sintering program:
โข Press the Right-hand arrow button until the LED under the โProg.โ display lights up.
โข Select a program number (1 โ 9) using the arrow buttons.
โข Set the heating parameters for each phase:
โข Heating speed
โข Target temperature
โข Holding time
โข To save the program:
โข Press and hold the Programming button until the LED under the function display lights permanently.
7. Automatic Program Start (Timer Mode)
โข The furnace allows automated operation using the timer function.
โข Select the desired sintering program.
โข Activate the integrated timer.
โข Set the day and time when the program should finish.
โข The furnace will automatically start the heating cycle at the calculated time to complete the program as scheduled.
8. Important Operating Notes
โข Always use tongs when handling hot components.
โข Do not open the furnace when the temperature is above 300ยฐC.
โข Ensure air vents remain unobstructed during operation.
โข Allow the furnace to cool completely before performing maintenance or cleaning.